Successful Perforations shutoff with Saltel Patch in Ecuador

Three Expandable Steel Patches set in the same well to shut off perforations, leaving large ID and strong collapse pressure ratings

3 Saltel Patches 7in were successfully installed to shut off producing perforations. This operation allowed converting the well from oil producer into re-injector well.

The client expectationsSaltelPatchInEcuador 1

The Patch had to meet 2 important requirements agreed with the client:
■ Maximum differential service pressure rating
■ Maximum Internal Diameter
Once installed, Saltel Patch successfully met these downhole requirements.

 

 

 

 

 

 

 

SaltelPatchInEcuador 2The solution

■ This job was the first in Ecuador
■ The job was completed in 110 hours without issue
■ The Patches were run through a 9-5/8 - 7in liner hanger, without issue
■ Setting depth: 9,600 ft [2,926m]
■ Setting temperature: 225°F [107°C]

The result

The patches were successfully installed, and the job was a success. Saltel Industries run 3 different patches with different lengths (8, 9, then 6meters-long patches) in the same well.

 

 

 

 


 

Saltel Expandable Steel Patch features:

■ Patch through Patch
■ Small run-in diameter
■ Simple setting process
■ Minimum reduction in ID, Large through passage
■ Simple top-down setting process: if difficulties occur the tools can always be easily retrieved, redressed, & the job completed
■ Fast feasibility study, job evaluation & proposal
■ Short lead times, a skilled operations team available worldwide
■ Proven technology (Over 600 patches set worldwide)
■ 97 % success ratio
■ Adapts to casing ID, even if out of round, corroded or deformed
■ Fits both to vertical and horizontal sections

 

3 Expandable Steel Patches set in the same well to shut off perforations, leaving large ID and strong collapse pressure ratings