Saltel Steel Packer combined with a stage collar or a DV Tool is run as part of the production string. The Packer can be set inside the previous casing shoe, or in the open hole below. The cement is pumped through the stage collar and placed above the expanded packer.
After closure of the cement port, the casing integrity is restored, allowing high pressure stimulation to be performed. The packer acts as an additional barrier to both seal the annulus and protect the cement.