Case Study – Xpandable steel external casing packer: successful off-bottom cementing operation despite difficult RIH conditions

Scroll Indication »

Published on 3 November 2018

Xpandable steel external casing packer: successful off-bottom cementing operation despite difficult RIH conditions

ECP 7in during 1ST run - Saltel Steel ECP: successful off-bottom cementing operation despite difficult RIH conditions

Context

Following a successful 2-wells campaign for one-stage and two-stage cement jobs, A third 7in Expandable Steel ECP (External Casing Packer) has been run to perform off-bottom cementing above preperforated casing.

Solution

Saltel Steel ECP is a proprietary expandable steel packer specially designed for stage cementing applications. Saltel Steel ECP 7in is a robust, simple and cost-effective barrier providing reliable support for stage cementing operation.

  • Simple setting process compatible with operator’s current string design and procedures
  • Quick installation time
  • Can be worked in doglegs or tight spots
  • Can be rotated while RIH
  • High sealing capability in cased hole or openhole
ECP 7in after POOH and before 2nd run
No damage despite it has been run
through tight spot
Partager :

This might be interesting