logo saltel industries
slogan
Here to Help
  • CONTACT US
  • Packer Job Evaluation Form

Steel Packer Job Evaluation Form
* Mandatory fields
Company(*)
Donnée invalide
Adress
Donnée invalide
Country
Donnée invalide
Title
Donnée invalide
First name(*)
Donnée invalide
Last name(*)
Please let us know your name.
Date job required
Donnée invalide
Phone number(*)
Please write a subject for your message.
Your Email(*)
Please let us know your email address.
Fax
Donnée invalide
THE APPLICATION
Your application(*)
Donnée invalide
Other Application
Donnée invalide
Attach a well completion diagram
Donnée invalide
Attach a well completion diagram & any useful document
Donnée invalide
RESERVOIR PRESSURE AND TEMPERATURE CONDITIONS AT PACKER LEVEL
Packer Depth
Donnée invalide
Absolute Pressure at Packer Depth
Maximum Absolute Pressure at packer depth
Donnée invalide
Minimum Absolute Pressure at packer depth
Donnée invalide
Measuring Unit (Pressure)
Donnée invalide
Temperature at Packer Depth
Maximum Temp at packer depth
Donnée invalide
Minimum Temp at packer depth
Donnée invalide
Measuring unit
Donnée invalide
   
GEOMETRY, RIH, AND SETTING
Absolute Pressure at Packer Depth
Base Casing
Diameter
Donnée invalide
Measuring unit
Donnée invalide
Weight
Donnée invalide
Material
Donnée invalide
Threads
Donnée invalide
Centralizer
Donnée invalide
Packer set in Casing or Openhole
Donnée invalide
If set in Casing or Previous casing if set in openhole
Casing
Diameter
Donnée invalide
Measuring unit
Donnée invalide
Weight
Donnée invalide
Material
Donnée invalide
Other information
Donnée invalide
If set in Openhole
Setting diameter
Nominal
Donnée invalide
Maximum
Donnée invalide
Measuring unit
Donnée invalide
Formation type
Donnée invalide
Porosity
Donnée invalide
Other information
Donnée invalide
Maximum RIH Diameter Initial Packer OD
Donnée invalide
Measuring unit
Donnée invalide
Dogleg Severity the Packer has to run through
Donnée invalide
Inclination at packer depth
Donnée invalide
Expansion Method
Donnée invalide
Expansion pressure (P Expansion = P Casing – P Annulus)
Min. Expansion Pressure in case of Fluid circulations different from mud weights
Donnée invalide
Max. Expansion Pressure String rating Completion element limitation
Donnée invalide
Measuring Unit
Donnée invalide
Temperature at Packer level during setting
Donnée invalide
Measuring unit
Donnée invalide
V0 rated internal external Required after packer set
Donnée invalide
Other information
Donnée invalide
   
GENERAL WORKING CONDITIONS
Long Term Sealing Expected
Donnée invalide
Lifetime Expectancy
Donnée invalide
Max Differential Pressure Across the Packer
Donnée invalide
Measuring unit
Donnée invalide
Differential pressure orientation
Donnée invalide
Annulus Differential Pressure reversals
Donnée invalide
Max. Casing to Annulus Pressure (Stimulation or Pressure Test) Pcasing - Ptop or Pbottom at packer level
Donnée invalide
Max. Annulus to Casing Pressure (Production) PTop or Bottom - PCasing at packer level
Donnée invalide
Measuring unit
Donnée invalide
Temperature cycles during Injection and Production
Maximum
Donnée invalide
Minimum
Donnée invalide
Measuring unit
Donnée invalide
Axial load Other than piston effect
Donnée invalide
   
DETAILED WORKING CONDITIONS DURING SPECIFIC PHASES (IF NEEDED) - PROD, STIM, SHUT-IN, CEMENT CURING…
PHASE 1
Max Differential Pressure Across the Packer
Donnée invalide
Measuring unit
Donnée invalide
Differential Pressure Orientation
Donnée invalide
Annulus Differential Pressure Reversals
Donnée invalide
Temperature
Maximum
Donnée invalide
Minimum
Donnée invalide
Measuring unit
Donnée invalide
Casing Pressure Test
Donnée invalide
Measuring unit
Donnée invalide
Other information
Donnée invalide
PHASE 2
Max Differential Pressure Across the Packer
Donnée invalide
Measuring unit
Donnée invalide
Differential Pressure Orientation
Donnée invalide
Annulus Differential Pressure Reversals
Donnée invalide
Temperature
Maximum
Donnée invalide
Minimum
Donnée invalide
Measuring unit
Donnée invalide
Casing Pressure Test
Donnée invalide
Measuring unit
Donnée invalide
Other information
Donnée invalide
PHASE 3
Max Differential Pressure Across the Packer
Donnée invalide
Measuring unit
Donnée invalide
Differential Pressure Orientation
Donnée invalide
Annulus Differential Pressure Reversals
Donnée invalide
Temperature
Maximum
Donnée invalide
Minimum
Donnée invalide
Measuring unit
Donnée invalide
Casing Pressure Test
Donnée invalide
Measuring unit
Donnée invalide
Other information
Donnée invalide
   
FLUIDS
Reservoir
H2S Concentration
Donnée invalide
H2S Concentration
Donnée invalide
Comments
Donnée invalide
CO2 Concentration
Donnée invalide
CO2 Concentration
Donnée invalide
Comments
Donnée invalide
Chloride Concentration
Donnée invalide
Chloride Concentration
Donnée invalide
Comments
Donnée invalide
Acidity Concentration
Donnée invalide
Comments
Donnée invalide
Petrol Type
Donnée invalide
Comments
Donnée invalide
Aromatics
Donnée invalide
Comments
Donnée invalide
API Index
Donnée invalide
Comments
Donnée invalide
Brines
Zinc Bromure
Donnée invalide
Comments (Zinc Bromure)
Donnée invalide
Formate (Cesium or Potassium)
Donnée invalide
Comments Formate (Cesium or Potassium)
Donnée invalide
NaCl
Donnée invalide
Comments NaCl
Donnée invalide
Corrosion Inhibitors
Amine based
Donnée invalide
Comments Amine based
Donnée invalide
Potassium carbonate
Donnée invalide
Comments Potassium carbonate
Donnée invalide
Acids
Strong acids
Donnée invalide
Strong acids rate
Donnée invalide
Comments Strong acids
Donnée invalide
Drilling mud
Diesel based
Donnée invalide
Comments (Diesel based)
Donnée invalide
Ester based
Donnée invalide
Comments (Ester based)
Donnée invalide
Silicate based
Donnée invalide
Comments (Silicate based)
Donnée invalide
Attach any useful information about Zonal Isolation Packer requirements Thermal cycling and Pressures during Stimulation / Production cycles, Acid treatment, frequency and exposure period, If available attach well or completion diagram, Fluid & Gas analysis reports
Attach a file
Donnée invalide
Enter the characters in the image(*) Enter the characters in the image
  Actualiser
Donnée invalide
In accordance with the Data Protection Act of 06/01/1978, you have the right to access, rectification and opposition to personal information about you that you can exercise with Saltel Industries Rue Siméon Poisson, Campus de Ker Lann, 35170 BRUZ, FRANCE.